Currently the U.S. is the top oil producer in the world.

It was about 18 months away from completion before the moron we have as pResident killed it 18 months ago. If you are going to comment on oil and gas try to actually know something about oil and gas.

Thats total bullshit my dear, and secondly it wasn't that long ago that you didn't even know the difference between the pipeline itself, and the XL extension
 
You don't know much about the petroleum business do you. The import and export of oil often has more to do about if the oil is heavy, sour, or light , sweet and what refineries are set up to process. We export oil that isn't what our refineries are set up for and import what they are set up for. That is why it was important to ship heavy Canadian Alberta oil to Gulf coast refineries that could refine it. But Joe in his great wisdom killed the XL Pipeline and that helped drive your gasoline even higher.

https://www.forbes.com/sites/rrapier/2017/09/30/why-the-u-s-exports-oil/?sh=5b7345983b07

should we build more of the right type of refineries here, in the nation?

be warned, if you answer isn't "yes, obviously" i will look at you weird.


this would be a better use of our funds than sending 60 billion to ukraine.
 
..
Mar 21, 2022 — The Biden administration has flirted with lifting oil sanctions on once-shunned Venezuela to temper surging oil prices

for what reason were the sanctions in place?

Nationalizing oil!

if we're going to violate that political principle, we should do it domestically.

this is a no brainer, unless one is retarded.

:tardthoughts:
 
On June 9, 2021, the Keystone XL project was abandoned by its developer. At the time of the project's cancellation, approximately 8% of the pipeline had been constructed.
The land was acquired the financing was done the actually construction was the shortest part. Its done multiple sections at the same times. It could be finished by now. But regardless its needed today or tomorrow .
 
The land was acquired the financing was done the actually construction was the shortest part. Its done multiple sections at the same times. It could be finished by now. But regardless its needed today or tomorrow .

The original Keystone pipeline does the same things, shitforbrains
 